Feasibility & DPR
Techno-Economic Feasibility Study
Know whether your hydroponic farm will pay back before you invest. We test the site, system, crops, costs and market, and put the numbers in a detailed project report.
- Detailed project report
- Costs, yields and payback
- Site-specific

What we study
Three questions every project must answer

Site feasibility
Location and access, land levelling, water quality and quantity, power availability, and the structure the site needs.

Financial feasibility
Capital cost, operating cost, yield forecast, market research, pricing assumptions, revenue and payback period.

Technical feasibility
System selection, irrigation and fertigation, IoT automation, climate control and the training your team will need.
Deliverable
What your report includes
- Site survey summary and layout options
- Recommended structure and hydroponic system
- Crop plan by season and system
- Equipment and materials list
- Capital expenditure, itemised
- Operating costs: nutrients, power, labour, consumables
- Yield and revenue projections with assumptions shown
- Payback period and sensitivity to price and yield
- Market and sales-channel notes
- Implementation schedule
- Risks and how to reduce them
- Format adaptable for banks and scheme applications
Who needs one?
Anyone investing in a commercial farm, applying for a loan or a horticulture scheme, or comparing two sites or systems.
Request a studyProcess
How the study is done
- 01
Brief
Your goals, site details, budget range and target buyers.
- 02
Site visit
Survey of land or roof, water, power and surroundings.
- 03
Analysis
System design options, costing and market review.
- 04
Report & review
We walk you through the report and answer questions.
What is a techno-economic feasibility study?
It is a detailed project report that checks whether a hydroponic farm makes technical and financial sense at your site. It covers site conditions, system and structure choice, crop plan, capital and operating costs, expected yields, revenue and payback.
Is a feasibility report the same as a DPR?
The study produces a detailed project report (DPR). The same report can be adapted to the format a bank or scheme office asks for.
How long does a study take?
Usually two to four weeks after the site visit, depending on project size and how quickly site data and quotations are available.
Will the study recommend against a project?
If the numbers do not work, the report says so and shows what would need to change, such as crop mix, size, structure type or sales channel.
Is the study cost adjusted if we build with Greenly?
Ask us when you request the study; terms depend on project size and are confirmed in writing in the quotation.
Talk to Greenly
Test your idea before you build.
Send us the site location and what you want to grow. We will confirm the scope and timeline for your study.